Description

Located in sec 22,T30N,R5E, Mount Diablo Meridian.

History

Earthen dam originally constructed in 1932. The dam failed in 1937 and again in 1952. After evaluation in 2000, the dam was considered to be at risk of failing and in 2011, the dam was breached and removed, restoring the original habitat.

Nearby Features