Burn Branch is a stream located in Covington County, Alabama. It appears on the Gantt USGS 7.5-minute topographic quadrangle. The elevation at this location is approximately 216.54 feet (66.00 m) above sea level. The nearest populated place is Clearview, approximately 0.6 miles to the WSW.